My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 9:40:13 AM
Creation date
1/11/2021 9:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lig:of Plan:Review ani men - 0 OF 12. <br /> Non-Technical Amendments <br /> ® Non-technical amendments are not certified by a Professional Engineer. <br /> ® Examples of changes include, but are not limited to, phone numbers, name changes, or any non- <br /> technical text change(s). <br /> Technical Amendments <br /> ® Technical amendments are certified by a Professional Engineer(§112.5(c)). <br /> Examples of changes include, but are not limited to, commissioning or decommissioning containers; <br /> replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of <br /> piping systems; construction or demolition that might alter secondary containment structures; changes of <br /> product or service; or addition/deletion of standard operation or maintenance procedures related to <br /> discharge prevention measures. It is the responsibility of the facility to determine, and confirm with the <br /> regulatory authority as necessary, what constitutes a technical amendment. The preamble of the rule <br /> states that an amendment is required only"when there is a change that materially affects the facility's <br /> potential to discharge oil" (67 FR 47091). <br /> An amendment made under this section will be prepared within six (6) months of the change and <br /> implemented as soon as possible but not later than six(6) months following preparation of the <br /> amendment. <br /> ® Technical Amendments affecting various pages within the plan can be P.E. certified on those pages, <br /> certifying those amendments only, and will be documented on the log form below. <br /> Management Review <br /> * Management will review this SPCC Plan at least each five (5) years and document the review on the form <br /> below(§112.5(b)). <br /> Amend Description of <br /> Review/Amend Signature Placa Affected P.E. Certification <br /> ®ate (Spec (willfwHI ea►iew a e(s) (YIN) <br /> rapt} Amendment <br /> 2114/2014 n %rill Nisp by D.K.f3a,rhe+ All Y <br />;i <br />
The URL can be used to link to this page
Your browser does not support the video tag.