Laserfiche WebLink
Lig:of Plan:Review ani men - 0 OF 12. <br /> Non-Technical Amendments <br /> ® Non-technical amendments are not certified by a Professional Engineer. <br /> ® Examples of changes include, but are not limited to, phone numbers, name changes, or any non- <br /> technical text change(s). <br /> Technical Amendments <br /> ® Technical amendments are certified by a Professional Engineer(§112.5(c)). <br /> Examples of changes include, but are not limited to, commissioning or decommissioning containers; <br /> replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of <br /> piping systems; construction or demolition that might alter secondary containment structures; changes of <br /> product or service; or addition/deletion of standard operation or maintenance procedures related to <br /> discharge prevention measures. It is the responsibility of the facility to determine, and confirm with the <br /> regulatory authority as necessary, what constitutes a technical amendment. The preamble of the rule <br /> states that an amendment is required only"when there is a change that materially affects the facility's <br /> potential to discharge oil" (67 FR 47091). <br /> An amendment made under this section will be prepared within six (6) months of the change and <br /> implemented as soon as possible but not later than six(6) months following preparation of the <br /> amendment. <br /> ® Technical Amendments affecting various pages within the plan can be P.E. certified on those pages, <br /> certifying those amendments only, and will be documented on the log form below. <br /> Management Review <br /> * Management will review this SPCC Plan at least each five (5) years and document the review on the form <br /> below(§112.5(b)). <br /> Amend Description of <br /> Review/Amend Signature Placa Affected P.E. Certification <br /> ®ate (Spec (willfwHI ea►iew a e(s) (YIN) <br /> rapt} Amendment <br /> 2114/2014 n %rill Nisp by D.K.f3a,rhe+ All Y <br />;i <br />