Laserfiche WebLink
Table of Contents <br /> Page <br /> 1.0 Introduction and Applicability-40 CFR 112.1(d).................................................................. 1 <br /> 2.0 General Facility Information & Contacts............................................................................................. <br /> 3 <br /> 3.0 Schedule for Implementation 40 CFR 112.3(a)................................................................... 5 <br /> 4.0 Amendments to Plan by Regional Administrator-40 CFR 112.4......................................... 5 <br /> 5.0 Amendments to Plan by Owner-40 CFR 112.5.................................................................. 5 <br /> 6.0 Overview of Facility Oil Storage-40 CFR 112.7(a)(3) ......................................................... 6 <br /> 6.1 Discharge Management-40 CFR 112.7(a)(3)........................................................... 6 <br /> 6.2 Prediction of Spill Characteristics-40 CFR 112.7(b).............................................. 10 <br /> 6.3 Containment and/or Diversionary Structures or Equipment- 40 CFR 112.7(c) ...... 12 <br /> 7.0 Oil Spill Contingency Plan -40 CFR 112.7(d) .................................................................... 12 <br /> 8.0 Inspections and Records-40 CFR 112.7(e)...................................................................... 12 <br /> 9.0 Personnel Training and Spill Prevention Procedures -40 CFR 112.7(f)............................. 13 <br /> 10.0 Security 40 CFR 112.7 .................. 14 <br /> 11.0 Facility Loading/Unloading Rack-40 CFR 112,7(h) .......................................................... 14 <br /> 12.0 Brittle Fracture Evaluation -40 CFR 112.7(i) ..................................................................... 14 <br /> 13.0 Conformance with State and Local Applicable Requirements-40 CFR 112.70)................. 14 <br /> 14.0 Facility Drainage-40 CFR 112.8(b) and 112.8(c)(3) ................................................15 <br />:I <br /> 14.1 General Facility Drainage........................................................................................ 15 <br /> 14.2 Drainage from Containment Areas.......................................................................... 15 <br /> 15.0 Sulk Storage Containers -40 CFR 11 2.8c ................... 16 <br /> 15.1 Tank Design and Overview..................................................................................... 16 <br /> 15.2 Secondary Containment........................... ............................... ..------.... 16 <br /> 15.3 Buried Storage Tanks ......................... ........... ........--........... ............... 16 <br /> 15.4 Integrity Testing ...................................................................................................... 17 <br /> 15.5 Internal Heating Coils..................... <br /> 19 <br />' . <br /> 15.6 Overfill Prevention.................................................................................................. 19 <br /> 15.7 Observation of Disposal Facilities for Effluent Discharge ........................................ 20 <br /> 15.8 Visible Oil Leak Corrections from Tank Seams and Gaskets.......................... 20 <br /> 15.9 Mobile or Portable Oil Storage Containers.............................................................. 20 <br /> 16.0 Facility Transfer Operations-40 CFR 112.8(d) ................................................................. 20 <br /> Appendices <br /> A. CERTIFICATION OF THE APPLICABILITY OF THE SUBSTANTIAL HARM CRITERIA <br /> B. MONTHLY INSPECTION CHECKLISTS <br /> C. INCIDENT REPORT <br /> D. SPILL RESPONSE DUTY CARD OIL HANDLING EMPLOYEES <br /> E. SPILL RESPONSE DUTY CARD INCIDENT COMMANDER <br /> F. UNLOADING TANK TRUCKS TO AB(���F�GROUND STS`RAG -11 ��&� <br /> I, <br /> G. C,FRTI FIE.D I WS FECTOR REF'ORIS <br /> Tales Page <br />'i 1. SUMMARY OF OIL, STORAGE............................................................................................ 6 <br />'? 2. POTENTIA1- SMI-1- SCENARIOS............. <br /> >. LANK INTEGRITY TESTING PROGRAM ................. . .. 16 <br /> Figures Follows Page <br /> -FE LOCATION MAP.......................................................................................................... 2 <br /> 1. SI <br /> 2. SI..f..E PLAN ............................................................................................................................. 2 <br />