My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0544259
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:40:40 PM
Creation date
1/11/2021 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0544259
PE
2361
FACILITY_ID
FA0024739
FACILITY_NAME
TOKAY SHELL
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TOKAY SHELL as of September30 , 2021 . <br /> Open violations from April 21, 2021 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br /> reports . The incorrect and missing information included the following from the inspection reports : <br /> -05/2020 through 10/2020 reports were missing the spill container test date <br /> -05/2020 through 10/2020 reports did not answer questions regarding overfill prevention and secondary containment <br /> testing <br /> -02/2021 through 04/2021 had the incorrect monitoring system certification and spill container test dates <br /> -the 02/04/2021 report did not address the L14 (annular) and L15 ( high limit) alarms on 01 /08/2021 <br /> REGULATION GUIDANCE: During the visual inspection , the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports . <br /> OBSERVATION: Designated operator reports were not signed within the required time frame . The 05/2020 through <br /> 04/2021 reports were not signed and dated by the owner/operator <br /> REGULATORY GUIDANCE: Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.