My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0544259
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:40:40 PM
Creation date
1/11/2021 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0544259
PE
2361
FACILITY_ID
FA0024739
FACILITY_NAME
TOKAY SHELL
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TOKAY SHELL as of September30 , 2021 . <br /> Open violations from April 21, 2021 inspection <br /> Violation #116 - Failure to submit the " Spill Container Testing Report Form" within 30 days . <br /> OBSERVATION Spill container testing was performed on 05/07/2020 and a test report was submitted on <br /> 08/28/2020 , 3 months late . <br /> REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests . <br /> CORRECTIVE ACTION : Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report . <br /> OBSERVATION An inspection was last done on 05/07/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 06/06/2020 . This information has not been received resulting in a non -compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #205 - Failure to have current UST Monitoring Plan readily accessible at the facility . <br /> OBSERVATION: An approved copy of the monitoring plans were not available for inspection . <br /> REGULATION GUIDANCE: A copy of these plans shall be accessible on site at all times . <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site . <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.