My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Healy Exhibit 8 <br /> Required Items in Conducting TP-201.3 <br /> (Executive Orders VR-201-M and VR-202-M) <br /> The instructions below are required when conducting TP-201.3 for these systems. The tester shall document that each step was <br /> followed as indicated below and shall include this page of the Exhibit with the submission of TP-201.3 test results. Note that <br /> districts may require use of an alternate form to meet these requirements, provided the alternate form includes the same <br /> minimum parameters. <br /> Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air Separator(CAS)shall be closed, as shown in <br /> 1. Figure 1 or Figure 1 H,to isolate it from the Underground Storage Tank(UST)system to permit the pressurization of the <br /> UST system. Figure 1 applies to vertical CAS installations and Figure 1 H applies to horizontal CAS installations. <br /> 2 Conducting TP-201.3 with any dispenser piping test valve in the closed position is not permitted. Any dispenser with a <br /> dispenser piping test valve in the closed position while conduction TP-201.3 will bias the test towards compliance. <br /> After conducting TP-201.3, the four ball valces on the Healy Clean Air Seperator(CAS)shall be locked in their normal <br /> 3. operating positions as shown in Figure 213-2 or 213-21-1, Exhibit 2 of Executive Orders VR-201-M and VR-202-M. Figure 213- <br /> 2 applies to vertical CAS installations and Figure 213-21-1 applies to horizontal CAS installations. <br /> Required Steps Verification <br /> 1.All four CAS ball valves closed before conducting TP-201.3 Yes <br /> 2.All dispenser piping test valves open before conducting TP-201.3 Yes <br /> 3.All four CAS ball valves in normal operating positions after conducting TP-201.3 Yes <br /> Test Company: TANKNOLOGY INC. Facility Name: 7-ELEVEN#32190, MKT 2368 <br /> Tim Elebeck �A1-4� UtW( 10/15/2018 <br /> Print Name(Technician) Signature Date <br /> 8001435 1/26/2020 <br /> Technician Certification Number Expiration Date <br /> (ICC or District Training Certification,as applicable) <br /> Items Required in Conducting TP-201.3, Exhibit 8- Executive Orders VR-201-M and VR-202-M <br /> WO:2338552 <br />
The URL can be used to link to this page
Your browser does not support the video tag.