My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 2:00:44 PM
Creation date
1/19/2021 7:57:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Manteca Valero 1 1700 E YOSEMITE AVE, MANTECA August 16, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 319 CCR 2635, 2637.2,2665, 2712 Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: Overfill prevention testing was conducted on 04/29/2021, 31 months late. Overfill testing was due <br /> by October 2018. The next overfill prevention is due on or before October 2021. <br /> REGULATION GUIDANCE: Overfill prevention equipment inspections were required to be conducted by October <br /> 13, 2018, and every 36 months thereafter, and within 30 days of completion of a repair. <br /> CORRECTIVE ACTION: Ensure all future testing is conducted within required time frames. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by 09/15/2021. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> ($152). To schedule an appointment, please call (209)468-3420 <br /> Documents provided during inspection: Inspection report, Corrective action statement form and a list of approve <br /> free CUPA training classes. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: August 16, 2021 Inspector: Inspector Phone: <br /> Printed Name and Title: PAUL NSO, EH Specialist (209)616-3049 <br /> E mailed to: Sunny Bhullar, Environmental Contact <br /> FA0003796 PR0231454 SCO01 08/16/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 6 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.