My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 11:56:42 AM
Creation date
1/19/2021 10:06:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer H Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure H Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank 1D 87 91 <br /> Tank Manufacturer Xerxes Xerxes <br /> Tank Capacity 20,000 15,000 <br /> Test Start Time 8:00 10:30 <br /> Initial Reading 10"hg 10"hg <br /> Test End Time 10:00 11:30 <br /> Final Reading 10"hg 10"hg <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results H Pass ❑ Fail H Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7 .PIPE'SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer H Industry Standard ❑ Professional Engineer <br /> Test Type H Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used. <br /> Pipe Run ID 87 Product 91 Product <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 9:45 9:45 <br /> Initial Reading 5 5 <br /> Test End Time 10:45 10:45 <br /> Final Reading 5 5 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results H Pass ❑ Fail 1 H Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fall ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.