Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> S. 'SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer R Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: ELDS <br /> Sump1UDC ID 87 STP 91 STP UDC 112 UDC 314 <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:24 10:14 1:26 1:05 <br /> Initial Reading 1.6653 3.7347 5.0754 1.1219 <br /> Test End Time 9:39 10:29 1:41 1:20 <br /> Final Reading 1.6654 3.7351 5.0752 1.1213 <br /> Change in Reading 0.00014 0.00043 0.00023 0.00070 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> [Tightness Test Results R Pass ❑ Fail N Pass ❑ Fail ® Pass ❑ Fail R Pass ❑ Fail <br /> Sump/UDC ID UDC 516 UDC 718 UDC 9110 UDC 11112 <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (Inches) <br /> Test Start Time 12:40 12:41 11:21 11:40 <br /> Initial Reading 3.8117 0.6521 4.8646 3.6781 <br /> Test End Time 12:55 12:56 11:36 11:55 <br /> Final Reading 3.8116 0.6522 4.8644 3.6779 <br /> Change in Reading 0.00019 0.00011 0.00022 0.00027 <br /> Pass/Fall Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail R Pass ❑ Fail R Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked"Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />