Laserfiche WebLink
California Department of Corrections and Rehabilitation <br /> TASK ORDER <br /> Instructions: This task order is used to request repair services under Agreement #C5609245 <br /> Aboveground and Underground Storage Tank Systems Inspection, Testing, Maintenance, Repair and <br /> Certification Services. The Institution Contract Liaison will complete Section A, save as a pdf file and <br /> email to: CDCR(aD_USTSERVICES.com with copy to: EnvironmentalComplianceProgram(d-)cdcr.ca.gov. <br /> The contractor will complete Section B and return to the Institution Contract Liaison for approval. The <br /> Institution Contract Liaison will indicate approval to proceed with the repair work by signing electronically <br /> and submitting back to the Contractor. Once the repairs have been completed, the Contractor will submit <br /> the completed task order with the invoice for payment. <br /> SECTION A (TO BE COMPLETED BY INSTITUTION CONTRACT LIAISON) <br /> Institution: NCYCC Date of Request: 9/13/21 <br /> Institution Contact Name: Susie Ayers Phone #: 209-944-6526 <br /> Aboveground Storage Tank ❑✓ Underground Storage Tank <br /> Tank ID: Gasoline Tank <br /> ISSUE: <br /> 1)The operational vent equipment tag (EVR)indicated it was past due for removal (see attached picture) <br /> 2)The liquid level gauge level (1ft, 9.5in)appeared to be within 1.5 to 2 inches of the manual measurements(1ft, 7.5in) <br /> collected today .The liquid level gauge should be calibrated using the manufacturer's instructions(see attached). <br /> 3)The overfill prevention valve was not accessible during the inspection today.According to the fill pipe tag the tank is <br /> equipped with a 9095 series valve (see attached info sheet). Condor recommends consulting a tank contractor or using <br /> staff maintenance to further inspect the overfill prevention device and check the calibration of the shutoff level. <br /> 4) Fuel is dispensing gas slowly. <br /> SECTION B (TO BE COMPLETED BY CONTRACTOR) <br /> Description of work to be performed (identify the problem, list the repairs and/or <br /> equipment or parts that may be used to complete the task order): <br /> See attached estimate 20180645 <br /> Cost Estimate (attach if necessary): $2,735.19 <br /> The State assumes no responsibility for any work commenced by the Contractor and will not reimburse <br /> the contractor for any work performed prior to approval and scheduling by the Institution Contract Liaison <br /> or designee. Payment will only be made on invoices accompanied by a Task Order signed by the <br /> Institution Contract Liaison or designee. <br /> Institution Contract Liaison: Digitally signed by Susie <br /> Susie Ayers Susie AyerAyers Dates 2021.09.1412:36:14 <br /> 07'00' <br /> Print Name Here Signature Date <br /> Page 1 <br />