Laserfiche WebLink
California Department of Corrections and Rehabilitation <br /> TASK ORDER <br /> SECTION C (TO BE COMPLETED BY CONTRACTOR) <br /> Description of work performed (attach additional documentation if necessary): <br /> 9/16/2021 RM <br /> *CALIBRATED MORRISON CLOCK GAUGE. GAUGE WAS OFF BY 4". <br /> *WILL BE RETURNING WITH P/V VENT TO REPLACE <br /> *CHECKED GPM/FLOW RATE, RATE IS AT 6.06, FLOW IS WITHIN RANGE. <br /> *DID NOT SEE AN OVERFILL VALVE TO CHECK CALIBRATION <br /> Technician Name: RON MCENTEE <br /> Labor Hours: 1.25 <br /> Parts/Equipment/Rentals: N/A <br /> Page 2 <br />