My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWCASTLE
>
7650
>
2800 - Aboveground Petroleum Storage Program
>
PR0527758
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:29:08 PM
Creation date
1/19/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527758
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003938
FACILITY_NAME
CDCR-NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER
STREET_NUMBER
7650
Direction
S
STREET_NAME
NEWCASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18115002
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7650 S NEWCASTLE RD STOCKTON 95215
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONFIDENCE UST SERVICES, INC. Estimate <br /> U� 2209 Zeus Court <br /> T <br /> Bakersfield, CA 93308 Date Estimate# <br /> 9/29/2021 20180645R2 <br /> COMPLIANCE WITH CONFIDENCE- <br /> Name/Address Ship To <br /> CA Dept.of Corrections&Rehabilitation NCYCC-Northern CA Youth Corr Center <br /> ASB-Sacramento 7650 South Newcastle Road <br /> Attention:Accounts Payable B Stockton,CA 95215 <br /> PO Box 187016 <br /> Sacramento,CA 95818-7016 <br /> Project <br /> NCYCC-Northern... <br /> Qty Description Cost Total <br /> E...............................................E................................................................................................................................:...............................................:...............................................: <br /> 2::3"Megapress Coupling 379.46: 758.92T:: <br /> 2::3"Megapress 90 350.02€ 700.04T:: <br /> 4 3"x 12"Nipples Schedule 40 black pipe 30.00: 120.00T <br /> 1 3"Union 72.00E 72.00T E <br /> 24::Reconfigure piping to access overfill valve,check overfill valve is 135.00E 3,240.00 E <br /> set to correct level <br /> €Construction crew:3 men, 1 day <br /> VISA D Subtotal $4,890.96 <br /> Phone# Fax# E-mail Web Site Sales Tax (9.0%) $148.59 <br /> 800-339-9930 661-587-9758 cheri@ustservices.com http://ustservices.com <br /> Total $5,039.55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.