Laserfiche WebLink
California Department of Corrections and Rehabilitation <br /> TASK ORDER <br /> SECTION C (TO BE COMPLETED BY CONTRACTOR) <br /> Description of work performed (attach additional documentation if necessary): <br /> 10/14/2021 <br /> WE ARRIVED ON SITE. THE REASON WE CAME IS THEY COULDN'T ACCESS <br /> THE DROP TUBE. WE CUT THE 4 INCH PIPE IN HALF, TOOK THE 4 INCH OUT <br /> AND PIPED A 3" PIPING WITH A UNION SO THEY CAN CHANGE OR INSPECT <br /> DROP TUBE. WE PULLED OUT DROP TUBE AND MEASURED IT AND IT WAS AT <br /> 100" AND TANK BOTTOM TO TOP WAS 106". WE ALSO INSTALLED THE PV <br /> VENT ON THE GASOLINE TANK. WE CLEANED UP SITE AND LEFT. <br /> Technician Name: DILLON, ANTHONY <br /> Labor Hours: 8 HOURS <br /> Parts/Equipment/Rentals: QTY 1 - HUSKY PV VENT VALVE, 5885 <br /> QTY 2 - BUSHINGS 4X3, 0301-0493 <br /> QTY 1 - 3" X 48" PIPE <br /> QTY 1 - 3" X 6" NIPPLE, 0403-0707 <br /> QTY 1 - 3" X 4" NIPPLE, 0403-0703 <br /> QTY 1 - 3" UNION, 3BIUN150# <br /> QTY 1 - 3" MEGA PRESS COUPLER, V28605 <br /> Page 2 <br />