Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 12/16/2020 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(p.9.sot s) <br /> XV1. MONITORING SITE PLAN <br /> Date site map was prepared' 12,16-Z-0 <br /> ff you afmady have a sfie plan that shows all required information.you may inctude it.rather than this page,with your twomkin.g System Certification <br /> Form- The sde plan rust show the general layout of tanks and plpfng and cleady identify!Canons of the fogowing equipment,d fnstafed: 1)monitoring <br /> system Can(rol panels;2)in-tank liquid level probes(d used for leak detection).3)devices rnonifodng tank annufar spaces ur vaud.-4)devices mondadng <br /> product piping,-S)devkes monitoring rill piping.6)devices monitodrg vent piping;7)devices mondoring vapor recovery piping;8)devices mortaring <br /> vent4ransilm sumps;9)devices mornifodrg under-dispenser containment 10)tine ioak detectors;and 11)devices monitoring any other secondary <br /> conhOnmenf areas. <br /> JR d <br /> t-1 <br /> 5z <br /> ( g Yc-0o <br /> s H7 5.. d o q (D-ai,AHlaz <br /> 3Zz ytcb Q_I �;� 4oS c y <br /> 3za <br /> L-9 L 352 0 <br /> t <br /> 91P O 09 a,pu�nwl4p• <br /> 8Z p�4 ya4l f <br /> 13 <br /> 4".3 35z <br /> 3zz 10`3d� <br /> q c- � o Q a <br /> s;l, Yo4c•� <br /> -rk b <br /> LEGEND <br /> Page 6 of 6 <br />