My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2800 - Aboveground Petroleum Storage Program
>
PR0516703
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2026 3:31:42 PM
Creation date
1/25/2021 10:38:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0516703
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\tchampion
Supplemental fields
Site Address
11530 W EIGHT MILE RD STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eFUEL, LLC 10 <br />flexible product lines. Ensure precautions are taken while working on the fueling <br />system above the water. <br /> Bagley to remove and replace old hose with new double walled hose. Weather <br />permitting---to be completed by 03/12/2021 <br />3.4.12. Post signage at the fill boxes with instructions for the fuel hauler detailing fuel <br />delivery standard operating procedures. <br /> Bagley-signage to be installed one week after painting of tank and accessories. <br />3.4.13. Contact your petroleum contractor to support the unsecured pipeline and <br />secondary containment lines coming out from the levy toward the dock. See <br />pictures below showing sagging pipe. <br /> Bagley to assist in house personnel-weather permitting task to be <br />completed N/L/t 03/12/2021 <br />3.4.14. Replace the missing spill kit on the dock area with sufficient supplies to manage <br />a spill on the water. Replace the missing spill kit near the tank fill boxes to <br />mitigate a spill at the storage tank. <br /> We have this spill kit locked in our office (costs over $1,000 and can easily be <br />stolen if placed on the dock). The kit can be brought to any spill within minutes. <br />3.4.15. Contact your petroleum contractor to assess the exposed wires under the <br />Unleaded Dispenser on the end of the dock. Either remove the wires or cap them <br />off in a manner consistent with the Electrical and Fire Codes pertaining to <br />electrical wiring around flammable materials. <br /> <br />Weather permitting (must be dry), Bagley can have this done by 2/12/21.
The URL can be used to link to this page
Your browser does not support the video tag.