Laserfiche WebLink
acility Number: <br /> WASTESOLID 7 39-AA-0051 <br /> 6. Windrows,feedstock,finish compost and overs shall be maintained to prevent the attraction or establishment of flies,rats or <br /> other vectors in the compost. <br /> 7. All piles onsite shall be monitored at multiple points for internal temperature to prevent fires and achieve pathogen reduction. <br /> 8. All incoming materials must be immediately spread out for manual screening. The materials may then be stockpiled after the <br /> manual scrrening. Unacceptable materials found in the stockpiled will be considered a violation of the hazardous waste <br /> screening program. <br /> 9. OSB and particle board that will be composted must be processed with the greenwaste and evenly distributed. The amount of <br /> OSB and particle board mixed with the greenwaste must be no more than 5%by volume. <br /> 10. Facility is receiving wood waste along with green waste.The wood waste is separated and placed in a pile. The wood waste <br /> is ground, stored,and taken to a facility to be used for energy. According to Title 14 CCR,Section 17381 (cc),the facility <br /> can not receive,process or remove more than 25 tons per day of the wood waste from the compost site. This activity is <br /> considered the CDI debris processing operation. <br /> 11. Site shall not accept commercial food waste,manure,or animal carcasses. Food waste brought in as feedstock must be <br /> limited to co-collected green and food waste off residential routes. The amount of foodwaste mixed with the greenwaste must <br /> not be more than 15%by volume. <br /> Page 5 of 5 <br />