Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T1: 87 S <br />T2: 87 M <br />T3: Diesel <br />T4:91 <br />Are both vent and tank riser piping <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />N No <br />N No <br />N No <br />N No <br />OPE Model <br />847390-107 <br />847390107 <br />847390107 <br />846390107 <br />What is the OPE response when activated? <br />❑ Shut off <br />❑ Shut off <br />❑ Shut off <br />❑ Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />N Restricts <br />N Restricts <br />N Restricts <br />N Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />N Audible <br />N Audible <br />N Audible <br />N Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />N Visual <br />N Visual <br />N Visual <br />N Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />N Yes* <br />N Yes* <br />N Yes* <br />N Yes* <br />that may interfere with the OPE operation? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />At what level in the tank is the OPE set to <br />75.09 <br />75.09 <br />75.04 <br />75.09 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at <br />90 <br />90 <br />90 <br />90 <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />N Yes <br />N Yes <br />N Yes <br />❑ Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />N Pass <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />OPE Inspection Results <br />❑ Fail <br />N Fail <br />N Fail <br />N Fail <br />S. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />1) Only one tank passes the OPEI but will not activate next alarms <br />unless the first alarm has been cleared. <br />2) FFS Drop tubes with overfill prevention valves will be installed <br />3) A permit with SJCEHD has been submitted <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2of2 <br />