My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:36:26 AM
Creation date
2/3/2021 9:33:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VEEDER- RV), }�' <br />=-� CE 6 201.8-02A <br />Continuing Education Bulletin. <br />1r-n�ci =_0verllatectlon'�'sx <br />-J-L+n040, M 15 <br />This Continuing Education Bulletin provides additional information to Veeder-Root service network and <br />technicians regarding Overfill Protection l estingrthr=l L -S -DU a�ari 1=L�q-�Frae-arret S�V1Ttst�f}�• <br />Sc. ope. <br />This document will provide a Veeder-Root A•i-C certified technician a procedure to safely test Tank <br />Overfill Protection. <br />Consoles: <br />TLS-LS-4i5DPL(JS,_TLiS4c, TLS4i, TLS -450 and TLS3XX <br />u it -e <br />LS4 <br />Au <br />ra <br />Overfill and close a relay feeding voltage to the Overfill Alarm Device <br />TLS-3XX: Output Relay programmed to close a relay on a Tank Overfill alarm feeding voltage to the <br />overfill Alarm Device <br />Procedure: <br />Inspection <br />a. Verify the levels in the tank to make sure there is product in the tank and that the tank is <br />enabled <br />b. Clear all tank alarms and other alarms which may affect the Overfill test <br />C. If the site is current) receiving a delivery,,wait until the delivery is complete <br />d. If the tank „is performing a SLD Tank test, stop the test <br />Preparation <br />a. Turn Alarm filtering off, this will allow you to clear alarms quicker <br />b. Program Delivery „delay to 1 minwite, this will allow the delivery to be cormleted quicker <br />i. Note the customers original value, so you can restore it after the test <br />c. Print the Tank Inventory Report <br />d. Test the relay assi_ net ed to the Overfill device to insure the overfill device worts <br />3. Testier <br />i. If the Overfill device does not sound, repair the device before continuing testin <br />a. Turn off power to the console <br />b. Disconnect the „probe from the field wiring. and remove it from the riser <br />i. If ou are testing more than one tank remove all the probes from their risers <br />c. Lay the probe safely,on the round and reattach the field wirin . <br />d. Position the water float at the bottom of the robe and the product float 25% up from the <br />t Qttom of the probe. <br />e. Power the console back on <br />f. Timuiate a delivery <br />i. Move the float towards the tog of the probe at a rate of 1-2" per ten second <br />H. Continue )moving the float to the top of the probe at a rate of 1-2" per ten seconds <br />for the next 50 seconds, therop be is not in delivery mode <br />Cha �291�_�18_/a--••-•••--Veeder-Root Company) Technical Support M -F rST: 8ar)I-bpm 11-800-323-1799 <br />technicalsupport@veeder.com I www.veeder,com su ort <br />
The URL can be used to link to this page
Your browser does not support the video tag.