Laserfiche WebLink
Monitoring System Certification <br />LST Monitoring Site Pian <br />Site address: _ CA ARNG, 2000 Stimson RD, Stockton ----- -- <br />L-1 UST Annular 420 sensor <br />North <br />L-2 UST STP 208 sensor <br />L-3 Reel UDC 208 sensor <br />L-4 Trans Sump 208 sensor <br />L-5 AST Annular 420 sensor <br />L-4 Trans <br />Vaporless LD 3000 Underground product , <br />Line Leak Detector piping to AST <br />L-2 STP <br />15K UST t. <br />Probe 0 —^-- L-3 Ree; UDC Above round i in <br />n 9 Pp 9 <br />i!I l"� W 1. <br />Overspill .0 r� Underground product <br />p ar'`' I piping to loading reel <br />L-1 AnnularF /I <br />�"`— Veeder-Root <br />1Q-21-2Q2Q No�e:.This Reel D uvhere we <br />propose to replace \a <br />won conduit <br />entry Doot with a B a <br />0---- OverfiJJ Alarm <br />piit repair on two conduits <br />Instructions <br />If you already have a diagram that shoe; all required ii7ror <br />E -Stop <br />n7ation, you may ii7ciUde it; rather than this page. with dour <br />Monitoring System Certification. On your site plan- show the general !a�out of tanks and piping. C}early idzntif� <br />locations of the following equipment. it installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors, and in -tank liquid leve) probes of used for leak detection). In the space provided. note the date this Site Plai; <br />was prepared. <br />Page � of __ � 05;00 <br />