My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:32:48 AM
Creation date
2/3/2021 10:07:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br />LST Monitoring Site Pian <br />Site address: _ CA ARNG, 2000 Stimson RD, Stockton ----- -- <br />L-1 UST Annular 420 sensor <br />North <br />L-2 UST STP 208 sensor <br />L-3 Reel UDC 208 sensor <br />L-4 Trans Sump 208 sensor <br />L-5 AST Annular 420 sensor <br />L-4 Trans <br />Vaporless LD 3000 Underground product , <br />Line Leak Detector piping to AST <br />L-2 STP <br />15K UST t. <br />Probe 0 —^-- L-3 Ree; UDC Above round i in <br />n 9 Pp 9 <br />i!I l"� W 1. <br />Overspill .0 r� Underground product <br />p ar'`' I piping to loading reel <br />L-1 AnnularF /I <br />�"`— Veeder-Root <br />1Q-21-2Q2Q No�e:.This Reel D uvhere we <br />propose to replace \a <br />won conduit <br />entry Doot with a B a <br />0---- OverfiJJ Alarm <br />piit repair on two conduits <br />Instructions <br />If you already have a diagram that shoe; all required ii7ror <br />E -Stop <br />n7ation, you may ii7ciUde it; rather than this page. with dour <br />Monitoring System Certification. On your site plan- show the general !a�out of tanks and piping. C}early idzntif� <br />locations of the following equipment. it installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors, and in -tank liquid leve) probes of used for leak detection). In the space provided. note the date this Site Plai; <br />was prepared. <br />Page � of __ � 05;00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.