Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />9. COMMENTS <br />Note: Testing was to confirm passing of post repair work to UDC electrical entries. Testing <br />was two passing back to back 15 minute tests (doubled up). <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 5 of 5 <br />