Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Super 91 2-Red Diesel <br /> Tank Manufacturer Joor JDWS Joor JDWS <br /> Tank Capacity 12K 5K <br /> Test Start Time 12:55 1:00 <br /> Initial Reading -6" Hg. -6" Hg. <br /> Test End Time 1:55 2:00 <br /> Final Reading -6" Hg. -6111-1g. <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-Super 91 2-Red Diesel <br /> Pipe Manufacturer Ameron/APT Ameron/APT <br /> Test Start Time 1:10 1:05 <br /> Initial Reading 5 Psi 5 Psi <br /> Test End Time 2:10 2:05 <br /> Final Reading 5 Psi 5 Psi <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />