Laserfiche WebLink
` Pastor A4att Linder' � <br /> May y S,,_043 . <br /> Page 2 - - <br /> Major System Components. ' <br /> System Design-Flow: 1$75 gpd: <br /> Prirhar3i,Tank Size: 2,000 gallons.with solidsgripump <br /> P g nder um �"acka e'and alarm. <br /> Circulation Tank Size:" 3,000 (optional use of 2,000 and 1,200 gal tank) <br /> Two AdvanTex AX-20 Pods , <br /> One pumping package for AdvanTex <br /> One splitter valve <br /> Our understanding is the"next step"in the processis'for EHD to assess,the capabilities of the'OSI <br /> AdvanTek system based on.the literature OSI provided to thein and"their experiences with engineered <br /> waste water.treatment-systems. EHD.will require the nitrate loading'addendutn and this letter to.review. . <br /> Should EHD approve the-use of the system,they will most likely require a maintenance contract,yearly <br /> permit to operate, and-possibly some.kind of effluent or ground-water quality monitoring..These <br /> requirements are typical for similar projects. <br /> A copy of this.letter,the nitrate loading study addendum, a service'request form,and a check for$178 <br /> should be submitted to EHD design proposal to their office. The nitrate loading study addendum <br /> discusses the impacts to.ground water using an"OST AdvanTex system. "Since the use of the system will <br /> need to be approval by EHD, a system drawing and disposal field layout is premature at this time. <br /> However, a parts list and cost estimate generated by OSI is attached to this letter. The final system <br /> drawirigs.wili be provided to'.you and EHD upon your request. At that time;�we understand_there will be <br /> a$890 review fee.by EHD to-evaluate the plans. <br /> Our professional services were performed,-our findings obtained,and our conclusions proposed in <br /> accordance with generally accepted engineering principles and practices. This warranty is in,lieu of all <br /> other warranties either expressed or implied."Test frndings,and_ statements of professional opinion do <br /> not constitute,a guarantee or warranty, expressed or implied. <br /> k, Best Regards;, <br /> NEIL O. ANDERSON&ASSOC., IN ' <br /> Ilt; David J.Welch,M.Sc:, Senior Geologist Ga H."Hubbart,M.Sc',Project Manager <br /> CEG-2151, CHG-653 Civil Engineer No. 59610: " <br /> attachments/" .OSI component list andart"cosi estimate <br /> P o�Es�f <br /> e <br /> f-D H. <br /> GFO <br /> i o s <br /> r Q .No..2151 N <br /> <� CERTIFIED o <br /> ENGINEERING o . . . <br /> � <br /> GEOLOGIST" <br /> �OF CAS-tFO� <br />