Laserfiche WebLink
Installation G Wle: AdvanTekm-AX Treats nt Systems <br /> The operation of the pump in the second compartment is controlled by a programmable timer in the <br /> Control Panel, which allows the pump to dose the filter for short periods (usually a minute or less), <br /> from 50 to 100 times a day. This frequent "micro-dosing," which optimizes the treatment process, <br /> occurs 24 hours a day, to maintain the proper biological environment. <br /> l a" <br /> ,7 � J. <br /> WE <br /> Installation-Ste s <br /> n <br /> l' <br /> The following installation steps are discussed in detail on the following pages. Please read,through a <br /> the entire installation guide before begin= installation. Failure to do so may cause installation <br /> delays and/or improper system operation. Note: You'll need a 1-9116" holesaw, in addition to standard <br /> pipe fittings. <br /> Step 1: Determining Positions of the Processing Tank and AdvanTex Filter <br /> Step 2: Excavating Hole for Processing Tank and AdvanTex Filter <br /> Step 3: Placing Processing Tank and AdvanTex Filter <br /> Step 4: Installing Access Risers on Processing Tank <br /> Step S: Installing Recirculating Splitter Valve <br /> Step 6: Installing Filtrate Return Line and Discharge Line <br /> Step 7: Installing Passive Air Vent <br /> Step 8: Installing Biotube' Pumping Package <br /> Step 9: Installing Transport Line <br /> Step 10: Installing Control Panel <br /> Step 11 : Checking for Watertightness <br /> Step 12: Backfilling Installation <br /> Step 13: System Start-Up <br /> © 2001 Grenco Systems Inc. EIM-ATX-AX-1 <br /> Information suhjcr.t to change without notice Rev 1.48/01 <br />