My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0033424_ENG DESIGNED PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
4200 – Liquid Waste Program
>
SR0033424_ENG DESIGNED PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:01:01 PM
Creation date
2/17/2021 4:48:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
ENG DESIGNED PLAN
RECORD_ID
SR0033424
PE
4202
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
Zip
95336
ENTERED_DATE
4/9/2003 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I n sta 1 1 ati o n. G u i d e: AdvanTexm-AX Treatment Systems <br /> 1) Incoming power to the panel. There may be one or more <br /> circuits required, depending upon the number of pumps <br /> and local electrical codes. <br /> f 2) Wiring from the control panel to the recirculation pump <br /> and floats. <br /> 3) When applicable, wiring to a discharge pump and floats. <br /> Checking for Watertightness <br /> i <br /> 1 <br /> Step 11A: Preparing Processing Tank <br /> Before filling tank, check the tank manufacturer's guide- 4 <br /> lines for filling. Some tank manufacturers require a partial <br /> or complete backfill before the tank is filled. <br /> Step 1113: Checking Connections <br /> Fill,the tank with clean water up to a level approximately <br /> one inch above the RSV Cage. At this point the water level <br /> should be well above the bottom float. In the control panel, <br /> turn on the pump by switching the MOA toggle to the <br /> "Manual" position. As water begins running through the <br /> system, ensure proper drainage through the Filtrate Return <br /> Line and RSV. All or some of the return filtrate flowing to <br /> the.RSV should be exiting the system through the final <br /> discharge line. Check that no water is leaking at any of the <br /> plumbing joints. <br /> Step 12 w � <br /> , -a <br /> Backfilling Installation <br /> Step 12A: Backfilling Processing Tank <br /> Backfill the excavation. Follow the tank manufacturer's <br /> guidelines for backfilling the tank. '' <br /> t <br /> Step 12B: Backfilling AdvanTex Filter .- <br /> Backfill and compact around filter in maximum 12" lifts. <br /> Native material is acceptable if there are no large or sharp <br /> rocks that may damage the filter walls. If native material is not <br /> useable, backfill with sand or pea gravel. Slope the ground ,. <br /> away from the filter to prevent surface water from ponding on <br /> or around the filter. Backfilling installation `` { <br /> l <br /> i <br /> E1M-ATX-AX-1 ©2001 Orenco Systems`Inc. <br /> Rev 1.4 HIM Information subject to change without notice <br />
The URL can be used to link to this page
Your browser does not support the video tag.