My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Order VR-202-Z <br /> Assist Phase II EVR System <br /> Including In-Station Diagnostic (ISD) Systems <br /> Exhibit 3 <br /> MANUFACTURING PERFORMANCE STANDARDS AND SPECIFICATIONS <br /> SECTION I <br /> Manufacturing Performance Standards and Specifications <br /> The Assist Phase II EVR System Including In-Station Diagnostic (ISD) Systems and <br /> all components shall be manufactured in compliance with the performance standards <br /> and specifications in CP-201 (amended April 23, 2015), as well as the requirements <br /> specified in this Executive Order. All components (Exhibit 1) shall be manufactured as <br /> certified; no change to the equipment, parts, design, materials or manufacturing process <br /> shall be made unless approved in writing by the Executive Officer or Executive Officer <br /> delegate. Unless specified in Exhibit 2 or in the CARB Approved Installation, Operation <br /> and Maintenance Manual, the requirements of this section apply to the manufacturing <br /> process and are not appropriate for determining the compliance status of a gasoline <br /> dispensing facility. <br /> 1. NOZZLES <br /> Every nozzle shall be tested at the factory. Every nozzle shall have affixed to it a <br /> card or label stating the performance specifications listed below, and a statement <br /> that the nozzle was tested to, and met, the following specifications. <br /> a. The nozzle vapor valve leak rate shall not exceed 0.038 cubic feet per <br /> hour (CFH) at a pressure of +2 inches H2O when tested in accordance <br /> with the latest version of TP-201.213. <br /> b. The nozzle vapor valve leak rate shall not exceed 0.10 CFH at a vacuum <br /> of -100 inches H2O when tested in accordance with the latest version of <br /> TP-201 .213. <br /> C. The nozzle automatic shut off feature is tested at all service clip settings <br /> (either two or three) as well as handheld in accordance with <br /> Underwriters Laboratories (UL) Standard 842. <br /> d. The nozzle is tested in accordance with the California Department of Food <br /> and Agriculture Division of Measurement Standards Article 2 <br /> (DMS 6-6-97). <br /> e. The nozzle is manufactured to specifications that passed the following <br /> tests during the CARB certification evaluation: <br /> TP-201 .2C - Spillage from Phase II Systems <br /> TP-201 .2D - Post Fueling Drips From Nozzles <br />
The URL can be used to link to this page
Your browser does not support the video tag.