My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VR-202-Z -2 Exhibit 3 <br /> TP-201 .2E - Gasoline Liquid Retention in Nozzles and Hoses <br /> f. The nozzle is manufactured to meet the Vapor to Liquid Ratio as specified <br /> in Exhibit 2. <br /> g. The terminal end of each nozzle shall be manufactured in accordance with <br /> the specifications referenced in Section 4.7.3 of CP-201. <br /> 2. INVERTED COAXIAL HOSES <br /> Every inverted coaxial hose is tested for continuity and pressure tests in <br /> accordance with UL Standard 330. <br /> 3. HOSE ADAPTORS <br /> Every hose adaptor is tested for continuity and pressure tests in <br /> accordance with UL Standard 567. <br /> 4. RECONNECTABLE BREAKAWAY COUPLINGS <br /> Every re-connectable breakaway coupling is tested for continuity and <br /> pressure tests in accordance with UL Standard 567. <br /> 5. FLOW LIMITER <br /> Every flow limiter is tested to 50 pounds per square inch (psi) liquid <br /> pressure to verify maximum gasoline flow rate limited to 10.0 gpm. <br /> 6. VP1000 VACUUM PUMPS <br /> a. Every vacuum pump is pressure tested in accordance with UL Standard <br /> 79. <br /> b. Every vacuum pump is manufactured to the exact specifications that <br /> passed all tests conducted during the CARIB certification. <br /> C. Every MC100 control module is tested in the factory to verify proper <br /> operation. <br /> 7. PASSIVETANK PRESSURE MANAGEMENT SYSTEM <br /> a. The Clean Air Separator tank is designed, constructed, tested, inspected <br /> and stamped per the American Society of Mechanical Engineers (ASME) <br /> Code Section VIII, Division 1, 2001 Edition, 2003 Addendum. <br /> b. Every Clean Air Separator bladder is performance and pressure tested <br /> using the Clean Air Separator Performance Test to ensure its integrity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.