My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Leave one nozzle activated on the first side and with the pump running, lift <br /> a nozzle on the other side of the dispenser (activated as above) and listen <br /> for a change of speed (increase) in the pump motor. Return both nozzles <br /> to the dispenser. <br /> ■ Repeat the above procedures to activate both sides of the dispenser, but <br /> start with the opposite side of the dispenser. If the above procedures can <br /> be confirmed by starting with the opposite side of the dispenser, the <br /> VP1000 vacuum pump is correctly installed. After the VP1000 vacuum <br /> pump gets to second speed, it will not drop back to single speed until one <br /> nozzle is reholstered. <br /> NOTE: In parts of the country where the outside temperature drops below <br /> 35°F, the VP1000 vacuum pump motor will automatically run at a very <br /> low RPM to prevent freezing. This is normal operation. <br /> 1.2. Quarterly Inspection and Testing <br /> 1 .2.1. Perform Weekly Inspection prior to Quarterly inspection. <br /> 1 .2.2. Inspect the VP1000 vacuum pump for loose or damaged vapor line connections. If <br /> copper tubing is kinked or loose remove the dispenser from service and call a Healy <br /> Certified Technician for service. <br /> 1 .2.3. Verify that the nozzle will not dispense fuel when the dispenser is authorized (ready <br /> to dispense fuel) and the boot is in a free state. To conduct this inspection, remove <br /> the nozzle from dispenser, authorize dispenser, hold nozzle into an approved <br /> container (do not compress the mini-boot in any manner) and actuate the nozzle <br /> lever. No fuel should dispense. Any nozzle that dispenses fuel with the miniboot in a <br /> free state condition, as determined by this inspection procedure, shall be removed <br /> from service until repaired or replaced. <br /> 1.2.4. Check product dispensing flow rate at maximum (handheld) dispensing position. <br /> Verify flow rate is between 6.0 gpm and 10.0 gpm. <br /> • Replace dispenser filters when flow rate is below 6.5 gpm and check flow rate <br /> again. If the flow rate does not increase after filter change, remove the fueling <br /> point from service. <br /> • If flow rates exceed 10.0 gpm, install either Healy Model 1301 or 1302 Flow <br /> Limiter and check flow rate again. If flow rate still exceeds 10.0 gpm, remove the <br /> fueling point from service. <br /> Note: <br /> If CAS is installed at GDF, conducted section 1.2.5 of Quarterly Inspection. If <br /> ARID Permeator AT-150 is installed at GDF, skip section 1.2.5 and proceed to <br /> section 1.2.6. <br /> 1 .2.5. Check Clean Air Separator for proper operating configuration. See Figure 1-1 or 1- <br /> 1 H for guidance. Figure 1-1 applies to vertical CAS installations. Figure 1-1 H applies <br /> to horizontal CAS installations. <br /> 1.2.6. Verify the total hours of Permeator AT-150 operation since the last oil change and <br /> I-2 <br /> CARB Approved IOM 1 —Systems Scheduled Maintenance—EO's VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.