My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4.2. Break-Away Reconnection: <br /> Reconnect the breakaway assembly per the procedure in the Re-connectable <br /> Breakaway Coupling section of the CARB Approved Installation, Operation <br /> and Maintenance Manual. <br /> 1 .4.3. Liquid Leak and Meter Creep Test: <br /> Authorize the fueling position, purge any air from the fueling position by dispensing at <br /> least two gallons of product into an approved container, and then inspect the hanging <br /> hardware for liquid leaks and/or meter creep. <br /> Note: With the fueling position still authorized and no product dispensing, the <br /> fueling position gallon display should not count up for at least two minutes <br /> while extending and twisting the hanging hardware to inspect for liquid leaks <br /> and/or meter creep. <br /> If no liquid leaks or meter creep are observed, proceed to section 1.4.4 of this <br /> procedure. If liquid leaks or meter creep are observed the operator may replace the <br /> curb hose, and/or nozzle, and/or breakaway, and/or whip hose, using the installation <br /> procedures and functional tests specified in the applicable CARB Approved <br /> Installation, Operation and Maintenance Manual (IOM), and re-conduct the liquid leak <br /> and meter creep test. If liquid leaks or meter creep are observed after replacement of <br /> the equipment, leave the dispenser out of service and contact a Certified Technician <br /> for repairs. <br /> 1 .4.4. Nozzle Bag Test: <br /> Conduct the Nozzle Bag Test using the procedure from Exhibit 7 of Executive Order <br /> VR-201 or VR-202. If the bag around the nozzle does not collapse, proceed to <br /> section 1.4.5 of this procedure. If the nozzle bag test fails, the operator may replace <br /> the nozzle using the installation procedures and functional tests specified in the IOM. <br /> 1 .4.5. Insertion Interlock and Automatic Shutoff Tests: <br /> • Test the insertion interlock feature of the nozzle using the procedures outlined in <br /> Sections 1.1.7 and 1.1 .8 in the Healy Model 900 Nozzle section of the IOM. If the <br /> nozzle fails either of these tests, the operator may replace the nozzle using the <br /> installation procedures and functional tests specified in the IOM. <br /> • Test the automatic shutoff feature of the nozzle using the procedures outlined in <br /> Sections 1.2.8, 1.2.9 and 1.2.10 in the Healy Model 900 Nozzle section of the <br /> IOM. If the nozzle fails any of the tests, the operator may replace the nozzle using <br /> the installation procedures and functional tests specified in the IOM. <br /> 1-4 <br /> CARB Approved IOM 1 —Systems Scheduled Maintenance—EO's VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.