My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: Persons doing this bladder replacement must be trained by a FFS Field service engineer <br /> before attempting this procedure. <br /> Valve A <br /> F Bladder AIR <br /> Syphon T VAPOR <br /> VAPOR <br /> Valve B Valve A <br /> AIR L <br /> Valve FigureY: Clean Air Separators: Component Locations <br /> Replacement Bladder Part#9943 <br /> 'Syphon Tube <br /> 4D <br /> 7. Remove the (8) |4-20bolts from the bladder flange <br /> 4E (0040). <br /> 8. Inspect bladder flange and nipple hmensure there <br /> are nosharp edges that could create ohole inthe <br /> 1. Close valves A& 8. then disconnect piping from bladder. <br /> the Clean air Separator(CAS). Q. Replace bladder byfitting the new bladder's end <br /> 2. |tiohighly recommended that Vertical Clean Air opening around the flange (Figure 2). <br /> Separators beplaced horizontally prior borepair. <br /> (Apowered lifting device will bonoedad). <br /> .��. <br /> Note: Lower the vertical CAS sUpvny and place <br /> cushioning (i.m. cardboard) under ittoprevent <br /> scarring the surface. <br /> 3. Remove the syphon tube. <br /> 4. Deflate the bladder hoease its removal and to <br /> ` y <br /> prevent damage during removal. <br /> \8/@[nin <br /> Explosion potential.Assume <br /> gasoline vapors are present. Use <br /> an intrinsically safe mrexplosion- <br /> proof*acuumnsomrcmtwdmf|atethe ~° <br /> bladder. Figure 2:Place Bladder onFlange <br /> 10 Lower the Clamp Ring with lubricated 0-ring to <br /> 5� Remnvetho (8)�4^ bo|tonenuringtheUange� 8e � <br /> aware that othread-locking compound was used hold the bladder inposition. <br /> nnthe threads, and more force will berequired to 11. Install the (8) \4-20bolts securing the clamp ring <br /> remove them. and bladder tothe bladder flange. <br /> Note: Account for all pads removed and reinstall in the Note: Using a onup|* 1'' |{-2O bolts can help hold the <br /> same order. flange components inposition while the other bolts <br /> are secured. <br /> 8. Carefully remove bladder from the Clean Air <br /> Separator. 12. Tighten all (8)screws tu 85-88 in-lbs using torque <br /> wrench set tobreak at80in-lbs <br />
The URL can be used to link to this page
Your browser does not support the video tag.