Laserfiche WebLink
18. Inflate bladder to 2" of water column and install <br /> 13. Inflate bladder to 2" of water column and check for syphon tube (Figure 4). <br /> leaks in accordance with CARB exhibit 4. <br /> 14. Deflate bladder and fold into thirds lengthwise. <br /> 15. Feed bladder into the Clean Air Separator. Take <br /> care not to damage bladder as you feed it into *I <br /> CAS. Support the flange end so no additional <br /> stress is put on the bladder as you feed the <br /> bladder into the CAS. Best to use 2 people during r this step _ <br /> 16. Align marks and secure the flange using the (8)3/4" <br /> bolts.Apply Loctite*to bolts. <br /> SY <br /> Figure 4:Install Syphon Tube <br /> - 19. Reinstall the Clean Air Separator per ARB <br /> Approved IOM - EO VR-201 and VR-202. Test the <br /> Clean Air Separator in accordance with Exhibit 4. <br /> Figure 3:Align Marks <br /> 17. Torque bolts to 80 ft/pounds. <br /> HEALY <br /> Franklin Fueling Systems <br /> www.franklinfueling.com <br /> * Loctite is a registered trademark of Henkel Corporation <br /> 3760 Marsh Road•Madison,WI 53718,U.S.A. <br /> Tel:+1 608 838 8786•Fax:+1 608 838 6433 <br /> Tel:USA&Canada 1 800 225 9787•Tel:Mexico 001 800 738 7610 <br /> Franklin Fueling Systems GmbH <br /> Rudolf-Diesel-Strasse 20•54516 Wittlich,GERMANY <br /> ©2015 FFS 405681001 rev 1 Tel:+49-6571-105-380•Fax:+49-6571-105-510 <br />