My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRIVE-OFF BREAKAWAY RECONNECTION PROCEDURE <br /> Use this procedure to either reconnect or disconnect (reverse order) the Healy 8701 VV Breakaway as <br /> part of Section 1.4 Procedure for Reconnecting Breakaway and Testing Fueling Point after Drive-Off <br /> in the Assist Systems Scheduled Maintenance. <br /> NOTE: Breakaway Reconnections must be logged in the GDF Maintenance Log. <br /> Reconnection Procedure Option <br /> I. HEALY BREAKAWAY RECONNECTION CLAMP .......................................................................... 1 <br /> II. EASYGRIP RECONNECTION TOOL ............................................................................................. 3 <br /> I. HEALY BREAKAWAY RECONNECTION CLAMP <br /> TOOLS NEEDED: <br /> • Healy Breakaway Reconnection Clamp, Part No. 795 <br /> • 8mm Hex Head Socket <br /> • Torque wrench <br /> • Safety glasses <br /> RECONNECTION PROCEDURE <br /> 1. Inspect each half of the separated breakaway for obvious damage to the outer-shell, plastic <br /> inserts or o-rings; including cracks, chips or tears that may effect reconnecting the two halves. <br /> 2. Check the shear pin bushing hole (see Figure 2) located in the top half of the breakaway <br /> for any part of the pin left behind at separation. A gentle tap on the opposite side of the <br /> breakaway should eject the pin. <br /> 3. After completing inspection, lightly lubricate the main o-ring on the top half of the breakaway. <br /> Any weight motor oil is acceptable. <br /> 4. Slide the top clamp of the Breakaway Reconnection Clamp onto the two flat surfaces on the <br /> top half of the breakaway (See Figure 1) installed on the dispenser (attached to whip hose). <br /> 5. Slide the separated bottom half of the breakaway (with hose and nozzle attached) onto the <br /> bottom clamp of the Breakaway Reconnection Clamp and begin squeezing the grip to slowly <br /> bring the two halves together. Check the main o-ring for position as the top and bottom of the <br /> breakaway come together. <br /> 6. Align the dowel pin in the bottom half of the breakaway with the dowel pin guide located in the <br /> B-2 <br /> GARB Approved IBM 0-Healy Breakaway Model 8701VV-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.