My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
top half of the breakaway. When dowel pin and guide are aligned, continue squeezing tool grip <br /> until the breakaway halves join together. <br /> CAUTION: Reconnection can cause a small amount of gasoline to leak out of the <br /> breakaway. A towel wrapped loosely around the breakaway can help to <br /> minimize fuel spills. <br /> 7. Remove the shear pin (#787) located in the spare shear pin location of the breakaway and <br /> install in place of the original. <br /> 8. Torque the shear pin to 20 inch-pounds (- 1.5 ft-lbs). DO NOT OVER-TIGHTEN. <br /> 9. If available, install a shear pin (#787) in the spare shear pin location. <br /> 10. Remove the Breakaway Reconnection Clamp. <br /> 11. Proceed with the tests outlined in Section 1.4 of the Healy Systems Scheduled Maintenance. <br /> Figure 1 Figure 2 <br /> sz <br /> • Dowel Guide <br /> TO Clamp Shear Pin Bushing Hole <br /> ~ Dowel Pin Q synt_►ry <br /> I ��a' y annx�r+Av Shear Pin Installation <br /> �uaurns <br /> - _ THAN r-0 Les. <br /> �noN <br /> SPARE <br /> } yy <br /> -y Pui Spare Shear <br /> �KUosnnla,w.x. Pin <br /> Tool Grip Bott ,, <br /> Franklin Fueling Systems Website: htto://www.franklinfueling.com <br /> 3760 Marsh Road Email: sales@franklinfueling.com <br /> Madison, Wisconsin 53718 USA Telephone: 800-225-9787 <br /> ARB Approved Installation, Operation and Maintenance Manual Fax: 608-838-6433 <br /> HEALY <br /> f Franklin Fueling Systems <br /> B-3 <br /> CARE Approved IBM 0-Healy Breakaway Madel 8781VV-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.