Laserfiche WebLink
8. INSTALLING THE HEALY VP1000 SYSTEM: <br /> ❑ Get the VP1000 mounting bracket and install to the center cross rail from the non- electrical <br /> J-box side, using two 3/8 — 16 x 2" bolts, nuts, flat and lock washers. Using the 2nd and <br /> 3rd holes from the right on the cross rail, select the bolt holes in the bracket that places the <br /> shelf of the bracket about 2" below the bottom of the cross rail. This position assures that <br /> the plumbing is self-draining and avoids traps in the vapor line. Do not completely tighten <br /> the hardware, see photo J. <br /> i WE= <br /> 1" Down pipe <br /> ti <br /> - r � <br /> I <br /> i <br /> ■ <br /> - u <br /> r , <br /> Mounting <br /> U' Bracket <br /> bend r <br /> Y _ <br /> Photo J <br /> ❑ Get the vapor pump and install a 1/2" NPT street elbow fitting into the 'IN' port and a 5/8" <br /> flare x 1/2" NPT elbow in the `OUT' port using tape, not pipe dope. Looking at the face of <br /> the pump, completely tighten both fittings so they are facing directly out from the front of <br /> the pump. <br /> ❑ Position the pump on top of the mounting bracket with the fittings facing in the direction <br /> shown in photo J. Slide the pump to allow for matching the location of holes in the pump <br /> and mounting bracket. <br /> ❑ Loosely secure the pump to the bracket using the four 1/4" bolts, nuts, flat and lock <br /> washers. (Final tightening is done after the electrical is completely installed.) <br /> ❑ Using tape, install a 1/2" close nipple into the street elbow. To this, install the 1/2" ball valve <br /> and one of the 5/8" flare x 1/2" NPT straight fittings. Final tighten such that the handle on <br /> the ball valve points upward when the valve is closed.❑ Install and final tighten a 1" x 1/2" <br /> reducer bushing into the 1" vapor down pipe. <br /> ❑ To the 1/2 " tee, install a 1/2 " x 1/4" reducer bushing into one of the end `run' openings, <br /> then install a 1/4" pipe plug into the bushing- final tighten. Install a 5/8" flare x 1/2 " NPT <br /> straight fitting into the other end `run' opening and tighten. Install a 1/2 " close nipple into <br /> the branch opening. <br /> 8-7 <br /> CARR Approved IOM 8-Gilbarco Encore 0 9 0 Series-Executive Orders VR-201 and VR-202 <br />