My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Install the above into the 1/2 " reducer fitting on the vapor down pipe, final tightening so <br /> the flare fitting faces away from the VP1000 pump, see photo J. <br /> ❑ Final connection from the pump to the down pipe is done after the electrical piping has <br /> been completed. <br /> 9. INSTALLING THE SEALED NIPPLE ASSEMBLY: (See Photo G) <br /> NOTICE: THE INTERFACE MODULE THAT IS SUPPLIED HAS A HARNESS ATTACHED <br /> AND A WIRING PLUG FOR THE AC CONNECTIONS. ALSO SUPPLIED IS THE SEALED <br /> NIPPLE ASSEMBLY (1316) THAT MUST BE USED BETWEEN THE ELECTRONICS <br /> COMPARTMENT AND THE DIVISION 1 AREA (THE SPACE BELOW AND OUTSIDE THE <br /> ELECTRONICS COMPARTMENT). <br /> F f <br /> Ma;cv <br /> Photo G <br /> ❑ In the electronics compartment, locate the sealed nipple that contains the dispenser wiring. <br /> Notice that there are 2 or 3 blank knockouts next to the existing nipple. Diagonally, to the <br /> left and below the existing nipple, knock out one pre-punched filler piece. (Punch only the <br /> same one on each plate. Do not leave any empty holes). <br /> ❑ Remove the two hex head screws holding the knock out panel in place. The panel <br /> cannot be removed, but can be raised to allow access to the lower vapor barrier panel for <br /> removing the knockout in that piece and also allows access for securing the nuts of the <br /> sealed nipple assembly. <br /> ❑ Get the 1316 sealed nipple assembly and carefully remove the first nut and washer over <br /> the wires. Tighten the other nut down on the nipple as far as it will go leaving the washer <br /> on top of the nut. <br /> ❑ Run wires (from the short threaded end of sealed nipple) down from electronics cabinet <br /> through lower knockout only. <br /> ❑ Push the rubber washer down on the sealed nipple approximately 2". Run wires (from the <br /> long threaded end of sealed nipple) and nipple up through the upper knockout plate. Install <br /> the washer and nut that was removed above and tighten the nipple securely to the plate. <br /> ❑ Reposition the upper knockout plate to its original location and secure with the previously <br /> removed screws. Check to be sure the rubber washer is seated on the lower panel. <br /> 8-s <br /> CARO Approved IOM 8-Gilbarco Encore 300 E 500 Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.