Laserfiche WebLink
4. HEALY/ ISD FLOW METER INSTALLATION PROCESS STEPS FOR KIT M07801 SO01 <br /> a. Power unit down e. Remove balanced vapor down spout tube by <br /> b. Remove lower doors. See Picture 001. removing u-bolt from bottom of tube on the <br /> inlet support rail. Unscrew the nut from the T— <br /> fitting in the top of the upper housing. Rotate <br /> the T—fitting 180 degrees. See Pictures 004, <br /> 005 and 006. <br /> Picture 001 e� <br /> c. Remove outer column sheathing from both <br /> sides of the unit by removing 4 screws holding <br /> sheathing to frame. See Picture 002. Picture 004 <br /> Picture 002 Picture 005 <br /> d. Remove upper housing top cover & lift <br /> brackets. See Picture 003. = <br /> r <br /> Picture 006 <br /> Picture 003 <br /> 8-24 <br /> CARO Approved IOM 8-Gilharco Encore 300 E 500 Series-Executive Orders VR-201 and VR-202 <br />