Laserfiche WebLink
v. Install a Healy electronic module to the <br /> channel in the cd module and secure with a <br /> nut and screw. See Pictures 027, 028. <br /> i <br /> Picture 031 <br /> x. Place the ISD/Flow meter assembly over the <br /> Picture 027 top inlet support and the lip of the side column <br /> of the lower frame assembly. Secure with (1) <br /> 8mm screw. See Picture 032. <br /> 1? <br /> r ■ gf <br /> Picture 028 <br /> w. Install cabling to base electronics. See Picture 032 <br /> supplied documentation & Pictures 029, 030, y. Slide the assembly into place and connect <br /> 031. the flare fitting to the tubing nut coming from <br /> the Healy pump assy. Tighten the nut. See <br /> Picture 033. <br /> Ar <br /> 7� <br /> •'Y <br /> 1 <br /> Picture 029 <br /> Picture 033 <br /> _ 1 <br /> Picture 030 <br /> 8-28 <br /> CARO Approved IGM 8-Gilbarco Encore 300 E 500 Series-Executive Orders VR-201 and VR-202 <br />