My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p. Connect the down spout tube to the Healy ball s. Install the conduit mounting plate to the lower <br /> valve assy. by screwing the nut on the tube to air gap plate & install a conduit washer over <br /> the fitting on the ball valve and tightening. See the conduit coming thru the lower air gap plate <br /> Picture 021. from the Healy subassembly. Secure plate <br /> with 2 screws. See Picture 024. <br /> 1 <br /> Picture 021 4 <br /> Picture 024 <br /> q. Reinstall the auxiliary junction box to the Healy <br /> sub assembly. Secure the box to the mounting t. Reinstall the upper conduit knockout plate to <br /> bracket by installing a nut to the stud coming the cd module using (2) screws. See Picture <br /> out of the back of the box. See Picture 022. 025. <br /> Picture 022 Picture 025 <br /> r. Feed the wires from the conduit & union u. Install a washer over the conduit and <br /> assembly thru the opening in the box and reconnect any cables that you disconnected. <br /> reinstall the union to the box. See Picture 023. See Picture 026. <br /> Picture 023 Picture 026 <br /> 8-27 <br /> CARR Approved IN 8-Gilbarco Encore 3OO E 5OO Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.