My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Photo G Photo H <br /> 8. INSTALLING THE HEALY VP1000 SYSTEM: <br /> NOTICE: WHEN DRILLING HOLES, ASSURE THAT THERE ARE NO HAZARDOUS VAPORS <br /> PRESENT AND DO NOT ALLOW CHIPS TO FALL DOWN INTO THE HYDRAULICS AREA. <br /> ❑ In order to make the vapor connection from the CX6-A hose adaptor installed outside the <br /> cabinet to the VP1000 pump installed inside the cabinet, it is necessary to drill or punch a <br /> 7/8" hole see photo I. Measure 1-1/4" to the left of the right edge of the side panel, make <br /> a small line. Measure 20-5/8" up from the bottom edge of the side panel (NOT THE BASE <br /> OF THE DISPENSER), make a small line forming a cross and drill or punch the 7/8" hole. <br /> Repeat on other side if a dual hose unit. <br /> ❑ In order to make the electrical connections from the VP1000 pump which will be installed <br /> in the meter area to the upper electronics compartment where the interface module is <br /> mounted a 1-1/8" hole has to be made. <br /> ❑ Before beginning this step, place a nonflammable, flexible drape over the meter and <br /> encoder gears to prevent chips from the following drilling operation from falling into the gear <br /> mechanisms. <br /> ❑ Carefully lift the previously loosened electronics chassis from the mounting bolts and <br /> position toward the electrical `J' box side of the cabinet about 5" from the edge of the shelf <br /> and set down. <br /> ❑ In line with the sealed nipple going to the meter encoder and 4-1/2" in from the edge of the <br /> chassis drill or punch a 1-1/8" hole to mount the 3/4" sealed nipple assembly, see photo J. <br /> 7 <br /> CARE Approved IOM 8-Gilharco Gashoy 9800 Series-Executive Orders VR-PDI and VR-2D2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.