My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> -- - - <br /> Al <br /> 4 'h" <br /> i <br /> Photo I Photo J <br /> ❑ Position the VP1000 pump on top of the sheet metal shelf on the right end, on the side <br /> opposite the main electrical `J' box, see photo F & G. <br /> 9. INSTALLING THE SEALED NIPPLE ASSEMBLY: <br /> ❑ Reposition the chassis to better expose the rectangular cutout in the side of the chassis. <br /> Surround this hole with rubber gasket material supplied, see photo K. <br /> ❑ Install the sealed nipple by carefully removing the first nut and washer, then slide the wires <br /> up, through the 1 1/8" hole and reinstall the washer and nut. Be sure at least one full <br /> thread is showing over the nut but not more than two threads and tighten the nuts securely, <br /> see photo J. <br /> ❑ Gather the upper wires and put through the grommeted opening in the chassis, from under <br /> the chassis and reposition the chassis on it's mounting studs. Check to be sure no wires <br /> are trapped under the edges of the chassis — do not re-install the mounting hardware at this <br /> time, see photo K. <br /> ❑ Below the top shelf, slide a 3/4" electrical coupling over the wires from the nipple, followed <br /> by the 3/4" x 6" electrical nipple. Secure these connections, see photo L. <br /> ❑ Remove the cover on the electrical junction box supplied and feed the nipple wires into the <br /> box until the box and nipple contact, then slowly rotate the box at least five turns before <br /> positioning the remaining conduit hub to the rear, towards the pump motor. <br /> 8 <br /> CARO Approved IGM 8-Gilharco Gasboy 9800 Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.