My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. BALANCE REMOVAL: <br /> NOTICE: BEFORE REMOVING THE 1" VAPOR DOWN PIPE, BE SURE TO CLOSE THE <br /> IMPACT VALVES ON BOTH THE PRODUCT AND VAPOR RETURN LINE (IF CONNECTED). <br /> DISCONNECTING THE PRODUCT LINE IN FRONT OF THE VAPOR DOWN PIPE WILL <br /> EASE REMOVAL OF THE PIPE — BE SURE TO USE PETROLEUM `DIAPERS' TO CATCH <br /> ANY FUEL THAT MAY BE SPILLED AS THE CONNECTIONS ARE BROKEN. <br /> ❑ Disconnect the two unions on the product pipe on both sides of the spin-on filter, see photo <br /> F. This will ease the removal of the vapor pipe. <br /> ❑ With the product filter removed, disconnect the vapor pipe from the 1" elbow that's attached <br /> to the vapor tee. Unbolt the tee from the bottom of the dispenser frame in order to remove <br /> the vapor pipe from the elbow. <br /> ❑ Swivel the pipe out from the cabinet far enough to allow turning it out of the tee at the top of <br /> the dispenser and discard the pipe. <br /> ❑ Bolt the tee back in the bottom frame and install a 1" x 1/2" NPT reducing bushing and a <br /> 1/2" NPT x 5/8" flare straight fitting. <br /> ❑ Reconnect the product plumbing. <br /> WARNING <br /> This retrofit kit requires drilling in a Hazardous Location. Insure that all power to <br /> the dispenser has been turned off. Open all access doors for increased airflow. <br /> Use only sharp drill bits; dull bits may generate excessive heat. Use air powered <br /> drill at low RPM's. If an electric drill is used, a suitable UL Listed Gas Detector <br /> must be used to ensure the area is below 25% of the Lower Explosive Limit. Do <br /> not drill if gasoline odors are present. <br /> If drilling in the electronics cabinet, carefully collect and remove all metal <br /> shavings that may be inside the cabinet. Failure to remove the shavings could <br /> result in an electrical shock hazard. Before drilling, check to ensure that no wires <br /> or fluid containing parts (i.e. product tubing) is located on the backside or near <br /> the chuck of the drill. <br /> 8-7 <br /> GARB Approved IOM 8-Wayne Harmony Series(Balance)-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.