My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. INSTALLING THE HEALY VP1000 SYSTEM: <br /> NOTICE: WHEN DRILLING HOLES, ASSURE THAT THERE ARE NO HAZARDOUS <br /> VAPORS PRESENT AND DO NOT ALLOW CHIPS TO FALL DOWN INTO THE HYDRAULICS <br /> AREA. <br /> ❑ In order to get the vapor tubing from the pump into the vapor plumbing area, it is necessary <br /> to drill or punch two 1-1/8" holes on the sheet metal column near the edge of the shelf, <br /> see photo E. Use a tape measure and mark the centerline of the holes to be 1-1/4" in <br /> from the front edge of the sheet metal column. Measure down from the top of the column <br /> 5-1/2" and mark on the 1-1/4" centerline, measure down an additional 6-3/4" and mark on <br /> the centerline. These marks are the centers of the holes for the vapor pipes going to the <br /> VP1000. DO NOT DRILL— verify positions in the next steps. <br /> ❑ Get the vapor pump and install a 1/2" NPT x 5/8" flare elbow fitting into the `IN' and `OUT' <br /> ports using tape, not pipe dope. Looking at the face of the pump, completely tighten both <br /> fittings so they are facing the right. <br /> ❑ Position the pump on top of the sheet metal shelf over the electrical junction box on top <br /> of the electronics cabinet, with the fittings pointing toward the hydraulics cabinet and <br /> overhanging the edge of the shelf about 1/4". <br /> ❑ Slide the pump to fit against the hydraulics cabinet and position so as to allow for matching <br /> the location of holes that need to be drilled through the sheet metal. <br /> ❑ Satisfied that the fittings and hole marks line up, remove the pump and drill the two, 1-1/8" <br /> holes, marked above. <br /> ❑ Position the pump assembly on top of the sheet metal shelf and slide over so that the ports <br /> are accessible from the hydraulics area. <br /> 10. CONNECTING VAPOR LINES: (See Photos F, G & H) <br /> ❑ Make connections below using pipe thread compound as required. <br /> ❑ Install a 1" x 1/2" NPT reducing bushing in the top vapor line manifold tee where the 1" <br /> down pipe was removed see photo G. <br /> ❑ Install a 1/2" NPT x 5/8" flair straight fitting into the above. <br /> 8-8 <br /> CARE Approved IOM 8-Wayne Harmony Series(Balance)-Executive Orders VR-281 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.