My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. SURVEY— Scope of Work: Perform this step before beginning steps 8 thru 12. <br /> Read and familiarize yourself with the theory of operations sheet and wiring instructions for the <br /> VP1000 Vapor Pump. The installation of the pump is on the sheet metal shelf over the junction <br /> box, with the pump cover facing the "A" side of the dispenser, see photo E. This is the side <br /> that the vapor tubes from the out port of the Wayne-VACTM vacuum pumps are connected to a <br /> vapor tee mounted at the base of the dispenser, see photo F. From this survey, you will have <br /> an indication of where the vapor plumbing fittings need to go and where the holes need to be <br /> drilled in the adjoining sheet metal to allow the vapor pipes from the pump to pass through to <br /> the hydraulics compartment. Notice also in the electrical junction box, on the bottom right side, <br /> there is a potted conduit nipple which contains the Wayne-VACTM wiring harness (for pump on <br /> "A" side) that you will remove to install the Healy potted conduit nipple, See Section 11. <br /> CAUTION: ALL POWER TO DISPENSER UNDER MODIFICATION SHOULD BE <br /> COMPLETELY DISCONNECTED AND CAPPED OFF AT JUNCTION BOX TO AVOID <br /> UNINTENTIONAL FEEDBACK FROM OTHER DISPENSERS!! <br /> 1�i f <br /> f <br /> I .I <br /> Photo E Photo F <br /> 8. WAYNE-VACTm REMOVAL: <br /> ❑ Disconnect and lockout the power to the dispenser. <br /> ❑ Open the dispenser cabinet doors as specified in section 6 above. <br /> ❑ Close the vapor recovery (Stage II Vapor return line) impact valve. If there is no impact <br /> valve, be sure to have proper plugs or caps available to plug the Stage II line before <br /> disconnecting the Wayne-VACTM equipment. <br /> ❑ Unscrew the flare nuts holding the vapor tube into the inlet of both VAC pumps, see photo <br /> G. <br /> ❑ Unscrew the flare nuts from the vapor port of both outlet castings and remove the vapor <br /> tubes, see photo H. <br /> ❑ Remove the 3/8" NPT x 3/8" flare elbow fittings from both outlet castings, see photo H. <br /> 8-B <br /> CARE Approved IBM 8-Wayne Harmony Series(Assist)-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.