My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Remove the 3/4" NPT flare fitting from the 3/4" elbow and install a 3/4" NPT x 5/8" flare <br /> straight fitting supplied in the Healy Vapor Kit, tighten securely. <br /> ❑ In the "J" box, bottom right, you will see the potted nipple containing the wire harness that <br /> was previously disconnected from the Wayne-VACTM pump. Follow this harness from the <br /> bottom of the potted nipple (under the "J" box) to the Wayne-VACTm electronics control <br /> board #887227; remove the (2) connectors from the board and also the green ground wire <br /> attached to the chassis. <br /> ❑ Remove the coupling (under the "J" box) from the potted nipple and wire harness that was <br /> just disconnected from the Wayne-VACTm electronics control board #887227. <br /> ❑ Remove the potted nipple from the "J" box and pull the wire harness out of the flexible, non- <br /> Oetallic electrical tubing and elbow, set aside. <br /> ❑ IMPORTANT: In the "J" box, bottom left, you will see the potted nipple containing the wire <br /> harness that controls the Wayne-VACTM pump on the "B" side of the dispenser. Follow <br /> this harness from the bottom of the potted nipple (under the "J" box) to the Wayne-VAC <br /> electronics control board #887227, remove the (2) connectors from the board and neatly <br /> bundle up out of the way. <br /> WARNING <br /> This retrofit kit requires drilling in a Hazardous Location. Insure that all power to <br /> the dispenser has been turned off. Open all access doors for increased airflow. <br /> Use only sharp drill bits; dull bits may generate excessive heat. Use air powered <br /> drill at low RPM's. If an electric drill is used, a suitable UL Listed Gas Detector <br /> must be used to ensure the area is below 25% of the Lower Explosive Limit. Do <br /> not drill if gasoline odors are present. <br /> If drilling in the electronics cabinet, carefully collect and remove all metal <br /> shavings that may be inside the cabinet. Failure to remove the shavings could <br /> result in an electrical shock hazard. Before drilling, check to ensure that no wires <br /> or fluid containing parts (i.e. product tubing) is located on the backside or near <br /> the chuck of the drill. <br /> 9. INSTALLING THE HEALY VP1000 SYSTEM <br /> NOTICE: WHEN DRILLING HOLES, ASSURE THAT THERE ARE NO HAZARDOUS <br /> VAPORS PRESENT AND DO NOT ALLOW CHIPS TO FALL DOWN INTO THE <br /> HYDRAULICS AREA. <br /> ❑ In order to get the vapor tubing from the pump into the vapor plumbing area, it is necessary <br /> to drill or punch two 1-1/8" holes on the sheet metal column near the edge of the shelf, <br /> see photo E. Use a tape measure and mark the centerline of the holes to be 1-1/4" in <br /> from the front edge of the sheet metal column. Measure down from the top of the column <br /> 5-1/2" and mark on the 1-1/4" centerline, measure down an additional 6-3/4" and mark on <br /> the centerline. These marks are the centers of the holes for the vapor pipes going to the <br /> VP1000. DO NOT DRILL— verify positions in the next steps. <br /> 8-8 <br /> CARE Approved IBM 8-Wayne Harmony Series(Assist)-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.