My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. INSTALLING THE SEALED NIPPLE ASSEMBLY: (See Photos O & P) <br /> NOTICE: THE INTERFACE MODULE THAT IS SUPPLIED HAS A HARNESS <br /> ATTACHED AND A WIRING PLUG FOR THE AC CONNECTIONS. ALSO SUPPLIED IS <br /> THE SEALED NIPPLE ASSEMBLY (1346) THAT MUST BE USED BETWEEN THE DIVISION <br /> 1 AREA (THE ELECTRONICS COMPARTMENT)AND THE DIVISION 2 AREA(THE SPACE <br /> ABOVE AND OUTSIDE THE ELECTRONICS COMPARTMENT). <br /> rr -- - - - ----- - - <br /> LL <br /> . . <br /> Photo I Photo P <br /> ❑ Get the 1346 sealed nipple assembly and carefully remove the first nut and washer over <br /> the wires. Thread these wires from inside the electronics compartment, up through the <br /> hole inside the "J" box, (bottom right) where the Wayne VACTM potted nipple was removed. <br /> Carefully replace the washer and nut over the wires and secure the unit into the box. <br /> ❑ At the VP1000, get and install the 1/2" male x 3/4" female adaptor over the wires coming <br /> from the motor. Do not use pipe dope on these fittings and be sure there is at least five full <br /> threads of engagement of the fittings in their respective couplings. <br /> ❑ Thread the pump wires through the elbow that was removed from the Wayne VACTM motor <br /> electronics housing and screw the threaded end with the "0" ring into the 1/2" male x 3/4" <br /> female adaptor installed in the above step. Tighten so that the elbow faces away from the <br /> "J" box, see photo P. <br /> ❑ Get the electrical tube that was left hanging during the Wayne VACTM removal, and route up <br /> to the VP1000 VAC pump as shown in photo P. <br /> ❑ Run the electronic wires from the VP1000 through the electrical tube and into the "J" box as <br /> shown. Reconnect the electrical tube to the elbow on the VAC pump. <br /> ❑ In the "J" box, leave about 6" of wire on both the wires coming from the motor and from the <br /> sealed nipple, cut off excess wire and strip approximately 1/2" of insulation from all wires. <br /> B-11 <br /> CARE Approved IBM 8-Wayne Harmony Series(Assist)-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.