Laserfiche WebLink
7. SURVEY— Scope of Work: Perform this step before beginning steps 8 thru 13, <br /> (See Photo G) <br /> Read and familiarize yourself with the theory of operations sheet and wiring instructions for <br /> the VP1000 Vapor Pump. The installation of the pump is on the sheet metal bracket, supplied <br /> in the hardware kit, and then installed on the right side panel in the hydraulics area when <br /> facing the "A" side of the dispenser, (this is the side with the IGEM board #173976). From this <br /> survey, you will have an indication of where the vapor plumbing fittings need to go and where <br /> the electrical tubing will need to run. Notice also on the "B" side, lower left of the electronics <br /> board support column, there is either a plugged hole or a WayneVac conduit that goes from the <br /> hydraulics to the electronic compartment. The wires to the motor will pass through this hole. <br /> The sealed nipple is installed here. See Section 12. <br /> CAUTION: ALL POWER TO DISPENSER UNDER MODIFICATION SHOULD BE <br /> COMPLETELY DISCONNECTED AND CAPPED OFF AT THE JUNCTION BOX TO AVOID <br /> UNINTENTIONAL FEEDBACK FROM OTHER DISPENSERS!! <br /> t <br /> It� i Y X ; 1 • t4 <br /> Z � <br /> I • ._� _ <br /> R 111 <br /> i <br /> 1 <br /> . - <br /> Photo G <br /> NOTICE: Ovation dispensers may either be fitted with WayneVACTM or Balance <br /> vapor recovery equipment. This equipment must be removed before the Healy <br /> VP1000 System is installed. See section 8 below for removal of a WayneVACTM <br /> system. If Balance equipped, go to section 9 titled "Balance Removal". <br /> 8-7 <br /> CARE Approved IOM 8-Wayne Ovation Series-Executive Orders VR-201 and VR-202 <br />