Laserfiche WebLink
WAYNE COUP- LOCK <br /> SEALED LING NUT <br /> NIPPLE <br /> Photo J <br /> ❑ In the electronics compartment, remove the potted assembly (with wires) from the tubing <br /> and discard all. <br /> ❑ The hole on the "A" side in the vapor barrier where the potted assembly was removed <br /> needs to be plugged. Get the washer seal assembly from the parts kit and install in this <br /> hole. (The small washer fits between the two large washers and is the same thickness as <br /> the sheet metal). The hole on the "B" side will be used when installing the Healy System. <br /> ❑ Remove the vapor tubes from the flare fittings attached to the 3/4" couplings under the <br /> barrier and the inlet of each pump, see photos K & L. <br /> ❑ Remove the 3/4" NPT fitting from both 3/4" couplings. CAUTION: Use a pipe wrench on <br /> the 3/4" couplings when removing the 3/4" NPT fittings to prevent loosening of the upper <br /> vapor piping. <br /> ❑ Loosen and slide back the nuts on the vapor tubes connected to the outlet side of both <br /> WayneVACTM pumps and the vapor cross that's mounted to the base of the dispenser. <br /> NOTE: The vapor tubes will stay in the fittings until the VAC pumps are removed. <br /> ❑ Remove the sheet metal screws on each side that secure the VAC pump mounting bracket <br /> to the frame and remove pump/bracket assembly from dispenser and vapor tubing. On <br /> one end, it will be necessary to remove the product filter in order to get the pump/bracket <br /> assembly out. Be sure you have petroleum `diapers' available to absorb any spilled fuel. <br /> NOTE: Reinstall product filter after VAC pump removal. <br /> ❑ Remove the 3/4" flare fittings from each side of the vapor cross. <br /> 8-s <br /> GARB Approved IOM 8-Wayne Ovation Series-Executive Orders VR-201 and VR-202 <br />