My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. CONNECTING VAPOR LINES: (ref. Photos P, Q & R) <br /> 1 I A <br /> I � <br /> F <br /> f <br /> l I: <br /> 3 <br /> Photo P Photo Q <br /> ❑ Make the pipe thread connections below using pipe thread compound as required. <br /> ❑ Get the 1/2" NPT x 5/8" x 5/8" flare tee and insert between the two preformed 5/8" copper <br /> tubes to be sure the tubes can be securely tightened, but DO NOT COMPLETELY <br /> TIGHTEN. <br /> ❑ Remove the tee and thread into the 1/2" street elbow, tighten to position shown in photo <br /> Q. To the elbow, add the 1/2" reducing tee and orient tee so the 1/4" branch opening is 75° <br /> to the elbow (facing the installer) with the elbow on the right and facing up. Install the 1/4" <br /> plug into the 1/4" opening on the tee. <br /> ❑ Install the 1/2" close nipple into the tee and follow with the 1/2" ball valve. Orient the ball <br /> valve so the lever is on the bottom when the 1/4" plug is facing sideways, see photo P. <br /> ❑ Install the 1/2" x 5/8" straight flare fitting into the ball valve. <br /> ❑ Reinstall the 5/8" flare tee back between the two preformed pipes, with the flare fitting <br /> facing the VP1000 and final tighten the flare nuts. The ball valve lever should be on the <br /> bottom and the 1/4" pipe plug horizontal facing you. Be sure the slope of the two pipes is <br /> downward and slopes to the tee. <br /> ❑ Measure and cut a length of 5/8" OD copper tube necessary to run from the pump inlet flare <br /> fitting to the flare fitting on the ball valve. Cut the copper tubing and slide on the flare nuts <br /> before flaring the ends. Carefully position this vapor tube to align fittings for tightening. <br /> Secure tubing connections to the pump and ball valve. Use care not to kink the tubing and <br /> maintain the slope downwards. <br /> ❑ On the "A" side of the dispenser, install the 3/4" pipe plug to the left end of the vapor cross <br /> and the 3/4" NPT x 5/8" flare elbow in the right end. Completely tighten the flare elbow so it <br /> is horizontal to slightly upward facing the out port of the VP1000. <br /> ❑ On the `B' side, install the 1/2" NPT x 5/8" flare elbow into the out port of the VP1000. <br /> Completely tighten until horizontal to downward facing the flare elbow on the vapor tee. <br /> (Use tape, not pipe dope) <br /> 8-13 <br /> GARB Approved IBM 8-Wayne Ovation Series-Executive Orders VR-PBI and VR-262 <br />
The URL can be used to link to this page
Your browser does not support the video tag.