Laserfiche WebLink
❑ Lastly, use Oil and gasoline compatible PTFE tape to install a 1/2" NPT x 5/8" flare elbow in <br /> the `IN' port of the pump. Face the elbow to the right when looking at the front of the pump, <br /> see photo N. <br /> I <br /> I <br /> I <br /> Photo N Photo O <br /> Mount the VP1000 and the vapor plumbing: <br /> ❑ Mount the pump/bracket assembly in the dispenser from the "B" side, (this is the side <br /> opposite the IGEM board #173976) using four 1/4" x 1/2 sheet metal screws, see photo <br /> O, View From "B" Side. <br /> ❑ On the `B' side of the dispenser, in the hydraulics area, locate the 3/4" vapor coupling on <br /> the right hand side under the vapor barrier. Install a 3/4" NPT x 5/8" flare elbow into the <br /> 3/4" coupling, completely tighten to face directly toward the cover panel opening. <br /> ❑ Still on the `B' side, locate the left end 3/4" vapor coupling protruding from the vapor <br /> barrier. Install a 3/4" NPT x 5/8" flare straight fitting into the threaded hole. <br /> ❑ Get the preformed 5/8" tube labeled left and attach the short leg to the left fitting just <br /> installed. Do not completely tighten at this time. <br /> ❑ Get the preformed tubing labeled right and install in the right end elbow fitting. Do not <br /> completely tighten at this time. <br /> 8-12 <br /> CARE Approved IOM 8-Wayne Ovation Series-Executive Orders VR-201 and VR-202 <br />