My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Lastly, use Oil and gasoline compatible PTFE tape to install a 1/2" NPT x 5/8" flare elbow in <br /> the `IN' port of the pump. Face the elbow to the right when looking at the front of the pump, <br /> see photo N. <br /> I <br /> I <br /> I <br /> Photo N Photo O <br /> Mount the VP1000 and the vapor plumbing: <br /> ❑ Mount the pump/bracket assembly in the dispenser from the "B" side, (this is the side <br /> opposite the IGEM board #173976) using four 1/4" x 1/2 sheet metal screws, see photo <br /> O, View From "B" Side. <br /> ❑ On the `B' side of the dispenser, in the hydraulics area, locate the 3/4" vapor coupling on <br /> the right hand side under the vapor barrier. Install a 3/4" NPT x 5/8" flare elbow into the <br /> 3/4" coupling, completely tighten to face directly toward the cover panel opening. <br /> ❑ Still on the `B' side, locate the left end 3/4" vapor coupling protruding from the vapor <br /> barrier. Install a 3/4" NPT x 5/8" flare straight fitting into the threaded hole. <br /> ❑ Get the preformed 5/8" tube labeled left and attach the short leg to the left fitting just <br /> installed. Do not completely tighten at this time. <br /> ❑ Get the preformed tubing labeled right and install in the right end elbow fitting. Do not <br /> completely tighten at this time. <br /> 8-12 <br /> CARE Approved IOM 8-Wayne Ovation Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.