My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARB Approved IOM 12 - ARID Permeator AT-150 - VR-201-Z /VR-202-Z <br /> Commissioning and Start-up of PERMEATOR on site <br /> Start-up testing for a GDF that has the Permeator AT-150 installed on it must be tested in <br /> accordance with the test procedures outlined in the CARB Executive Order VR-202 <br /> series (starting with Revision Y). These tests are listed below: <br /> TP-201.3 (Leak Decay) <br /> Exhibit 8 (Items to Consider when Conducting TP-201.3) <br /> TP-201.4 (Dynamic Back Pressure—if applicable) See Note Below <br /> Exhibit 5 (V/L of Model 900 Nozzle) <br /> Exhibit 9 (Veeder-Root ISD Operability Test) <br /> Exhibit 11 (Liquid Condensate Trap Compliance—if applicable) <br /> Exhibit 14 (Dispenser Integrity) <br /> Exhibit 15 (Permeator Compliance) <br /> Note: TP-201.4, Dynamic Back Pressure (July 3, 2002), is primarily conducted <br /> at new GDF installations prior to backfill. If required by the District, it <br /> shall be conducted in accordance with the conditions listed in item 1 of <br /> the Vapor Recovery Piping Configurations Section of Exhibit 2. Districts <br /> have the authority to require conducting of Exhibit 5, Vapor to Liquid <br /> Volume Ratio, in lieu of TP-201.4, provided that at least two gallons of <br /> product are introduced into the system through each dispenser riser prior <br /> to conducting the test. <br /> Liquid Leak Integrity Testing <br /> EPA approved and third-party tested liquid leak technologies should be applied to new <br /> and existing sites before the PERMEATOR system is started up and commissioned. The <br /> application of such protocols will ensure that the liquid piping and tankage is leak free. <br /> The choice of a test protocol lies with the local installation contractor. <br /> Pressure Control Set Points <br /> In automatic control mode, the vacuum pump is actuated when the upper control limit <br /> (P hi) of 0.30± 0.06"W.C. is reached by the measured variable—the underground <br /> storage tank pressure. On the plc (B, Figure 2), the Motor status box on the lower right <br /> side will indicate ON. At the same time, the minimum run timer will ensure operation for <br /> at least the factory pre-set minimum run time. If the tank pressure is reduced to the <br /> Lower Control Limit(P lo) of 0.20 10.06"W.C. before the minimum run time period has <br /> elapsed, the vacuum pump will continue to operate. At any time after this 40-minute <br /> interval, when the storage tank pressure reaches the low pressure set point, the vacuum <br /> pump will shut off. <br /> Note: If the tank pressure drops below zero (negative pressure) at any point during the <br /> 40-minute run interval (as measured by the PERMEATOR pressure sensor), the <br /> PERMEATOR will shut off to limit electricity usage and unnecessary run time for <br /> the system. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.