My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VR-202-Z -2 Exhibit 2 <br /> Vapor Collection <br /> 1. The V/L ratio of the system shall be 1.05 plus or minus 0.10 (0.95 to 1.15), <br /> measured at a flow rate between six and ten gallons per minute (6.0 — 10.0 gpm). <br /> Any fueling point whose V/L ratio is determined to be at or below 0.80 shall be <br /> deemed defective and removed from service. The V/L ratio shall be determined by <br /> using the test procedure in Exhibit 5 with the shut-off port excluded, or with a <br /> CARB approved alternate test procedure. See Section 7 of Exhibit 5 for guidance <br /> on V/L adjustment. <br /> 2. Inoperative vapor pumps, as determined by the CARB Approved <br /> Installation, Operation and Maintenance Manual, constitute a defect. <br /> 3. For unihose dispensers, any modifications or repairs to the nozzle, hanging <br /> hardware or vacuum pump done to bring one fuel grade V/L into compliance at <br /> a fueling point invalidates the results of any previous fuel grade(s) tested before <br /> the alteration. All fuel grades at that fueling point shall be tested again to verify <br /> compliance. <br /> Inverted Coaxial Hoses <br /> 1. The maximum length of the hose assembly, including hose adaptor, whip hose, <br /> breakaway, flow limiter (optional) and inverted coaxial hose, measured from the <br /> base of the nozzle to the end of dispenser adapter or dispenser, as appropriate, <br /> shall be no more than eighteen (18) feet. <br /> 2. Any hose configuration is allowed. <br /> Breakaway Couplings <br /> Testing is required after reconnecting the breakaway to ensure proper operation <br /> and no observed leaks. The procedure for reconnecting breakaway and fueling <br /> point testing after a drive-off, referenced in Section 1.4 of Scheduled <br /> Maintenance, shall be conducted to verify that breakaway, hose and nozzle are <br /> operating properly after a drive-off. <br /> Flow Limiters <br /> Flow limiter is mandatory when the flow rate is greater than 10.0 gallons per minute <br /> to comply with U.S. EPA requirement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.