Laserfiche WebLink
VR-202-Z -7 Exhibit 2 <br /> Liquid Condensate Traps <br /> 1. There shall be no vapor leaks when tested in accordance with the latest version <br /> of TP 201.3, Determination of 2 Inch WC Static Pressure Performance of <br /> Vapor Recovery Systems of Dispensing Facilities. <br /> 2. The Liquid Level Sensor shall alarm within five (5) minutes when tested in <br /> accordance with Exhibit 11, Liquid Condensate Trap Compliance Test. <br /> 3. The Liquid Level Sensor audible alarm shall be installed at a location that is most <br /> likely to be heard by the station attendant during normal station operation (e.g. <br /> cash register). <br /> 4. The Liquid Evacuation System shall automatically evacuate gasoline when tested <br /> in accordance with Exhibit 11, Liquid Condensate Trap Compliance Test. <br /> 5. A metal tag specifying the capacity of the Liquid Condensate Trap shall be <br /> installed and maintained as specified in the Installation, Operation, and <br /> Maintenance Manual. <br /> Maintenance Tracker Kit for Veeder Root TLS Console (Optional) <br /> • The Maintenance Tracker kit consists of the following devices: <br /> • Maintenance Tracker Technician Key <br /> (Figure 2-11) <br /> • Interface Module RS232/485 Dual Module with D139 Converter or Single Port <br /> Module with DB-25 converter <br /> (Figure 2-12) <br /> • Manual <br /> In-Station Diagnostics <br /> Veeder-Root In-Station Diagnostics <br /> 1 . The gasoline dispensing facility operator/owner and contractor shall comply <br /> with local district requirements, if any, following a warning by the Veeder-Root <br /> In-Station Diagnostics (ISD) system. <br /> 2. Suggested Troubleshooting, found in Table 5-1 of the Veeder-Root In-Station <br /> Diagnostics ISD) Install, Setup, and Operation Manual (CARB Approved <br /> Installation, Operation, and Maintenance Manual), recommends that certain <br /> tests be conducted to verify the cause of the ISD warning or failure alarms. <br /> Districts may require that these tests or other tests specified by the districts be <br /> conducted in response to the ISD alarms. <br />